Skip to main content

    CCAMLR Compliance Evaluation Procedure (CCEP) Summary Report and analysis

    Request Meeting Document
    Document Number:
    CCAMLR-39/10 Rev. 2
    Author(s):
    CCAMLR Secretariat
    Submitted By:
    Ms Doro Forck (CCAMLR Secretariat)
    Approved By:
    Dr David Agnew (CCAMLR Secretariat)
    Abstract

    In accordance with CM 10-10, paragraph 2(i), and the procedure detailed in COMM CIRC 20/73, the Secretariat has prepared the Summary CCAMLR Compliance Report (Summary Report) based on the Draft CCAMLR Compliance Reports (Draft reports), responses received from Contracting Parties, and the suggested preliminary compliance status. The Draft reports identified 45 potential conservation measure compliance issues in relation to 17 conservation measures affecting 12 Contracting Parties in the period 1 July 2019 to 30 June 2020 (the compliance reporting period). The Secretariat circulated Draft reports on 12 August 2019 and the Summary Report containing Contracting Party responses is Annex 1 to this paper.