Skip to main content

    CCAMLR Compliance Evaluation Procedure (CCEP) Summary Report and analysis

    Request Meeting Document
    Document Number:
    CCAMLR-40/07 Rev. 1
    Author(s):
    CCAMLR Secretariat
    Submitted By:
    Ms Doro Forck (CCAMLR Secretariat)
    Approved By:
    Ms Doro Forck (CCAMLR Secretariat)
    Abstract

    In accordance with Conservation Measure (CM) 10-10, paragraph 2(i), and the procedure detailed in COMM CIRC 21/80, the Secretariat has prepared the Summary CCAMLR Compliance Report (Summary Report) based on the Draft CCAMLR Compliance Reports (Draft reports), responses received from Contracting Parties, and Contracting Parties’ suggested preliminary compliance status. The Draft reports identified 77 potential issues in the implementation of conservation measures across 13 conservation measures and 20 Contracting Parties for the compliance reporting period (1 July 2020 to 30 June 2021). The Secretariat circulated Draft reports on 04 August 2021 and the Summary Report containing Contracting Party responses is Annex 1 to this paper.